The T218 Pump-Out Cement Sleeve
is used for cementing liner strings in the well bore usually run above the T440 Casing Packer. The T218 Pump-Out Cementing sleeve is run above
the T440 Casing Packer, once the Casing Packer is set (tension or compression) the T218 is
activated by gravitating a ball into the lower seat, applied pressure shifts lower seat
and opens port holes for cementing. After the cementing operation is completed, pump the
wiper plug into the upper seat and apply pressure to shift the closing sleeve over the
port holes. Final pressure of 2500 PSI will pump out all internal parts of the T218
Pump-Out Cementing Sleeve.
|
|
SIZE |
MAX O.D. |
MIN. I.D. @ PUMP-OUT |
THREAD CONNECTION |
PRODUCT NUMBER |
2-3/8 |
3.125" |
2.000" |
2-3/8 EUE 8RD |
T218-20A-000 |
2-7/8 |
3.750" |
2.500" |
2-7/8 EUE 8RD |
T218-25A-000 |
3-1/2 |
4.500" |
3.000" |
3-1/2 EUE 8RD |
T218-35A-000 |
4.0 |
4.625" |
3.453" |
4.0 NU 8RD |
T218-40A-000 |
4-1/2 |
5.500" |
4.000" |
4-1/2 8RD CSG |
T218-45A-000 |
5-1/2 |
6.500" |
5.000" |
5-1/2 8RD CSG |
T218-55A-000 |
![]()