The TEAM Oil Tool Ball Launch System provided the operator a safe and reliable method of dropping balls on a ball activated multistage frac completion. The time savings, improved well-site safety, and frac efficiency provided immeasurable value to the operator.
The TEAM Oil Tool T-Frac System™ provided the operator the benefits of a cemented lateral with the benefits of the ball activated frac sleeve completion, saving hundreds of thousands of dollars in horsepower charges.
The TEAM Oil Tool ORIO™ Toe Valve (Patented US PAT # 8,267,178) allows operators the ability to test the casing to pressures in excess of frac pressures and further open the toe to injection without any remedial operations. Estimated savings are upwards of $120,000 per well.